Cloud infrastructure migration services

Cloud & Server Infrastructure Migration

On-premise to AWS, Azure, or GCP migration, from lift-and-shift rehosting to full cloud-native rearchitecting, planned around your actual workload dependencies.

Book a discovery call
See all migration services

30+
Years of enterprise infrastructure engineering experience
AWS, Azure & GCP
Cloud platforms we migrate to and operate on
Zero
Workloads migrated without individual assessment

The problem

Not every workload should migrate the same way.

Cloud infrastructure migration projects go wrong most often when every workload gets the same treatment, either all rehosted as-is, missing the cost and performance benefits of cloud-native services, or all rearchitected, burning budget on workloads that didn’t need it.

  • Aging on-premise infrastructure with rising maintenance costs
  • No clear plan for which workloads to rehost versus rearchitect
  • Cross-system dependencies that make migration sequencing risky
  • Security controls that need to be rebuilt, not just replicated, in the cloud

What’s included

What a cloud migration engagement covers

Every workload is assessed individually for the right migration approach.

Workload assessment

Every application and dependency inventoried and classified for rehosting or rearchitecting.

Migration sequencing

A staged plan that minimizes cross-system risk during the transition.

Security & access rebuild

Network controls, encryption, and identity management configured for the new environment.

Validated cutover

Performance validated against current benchmarks before on-premise infrastructure is decommissioned.

Talk to a senior migration engineer before you commit to a build.

Free 15 minute discovery call. No resellers, no sales script.

Book your free discovery call

Our approach

How we migrate infrastructure without a one-size-fits-all approach

Workload & dependency audit

We assess every workload individually, not as a single blanket migration.

Rehost vs. rearchitect decisions

Each workload gets the migration approach that fits its actual requirements.

Staged migration

Workloads move in a sequence designed to minimize cross-system risk.

Validated go-live

Performance and security validated before any on-premise infrastructure is decommissioned.

For US founders & operations leaders

Why cloud migration project plans need a rehost-or-rearchitect decision per workload

Mainframe to cloud migration and on-premise to cloud migration projects both hit the same decision point repeatedly: should this specific workload move as-is, or should it be redesigned to use cloud-native services. AWS cloud migration services and azure cloud infrastructure migration both support either approach, but treating every workload the same way usually means overpaying for some and underperforming on others.

Server virtualization migration and broader cloud infrastructure refactoring work best when sequenced around actual dependencies, migrating a workload before the systems it depends on are ready just moves the outage risk instead of eliminating it. A migration plan that respects those dependencies is what keeps a multi-workload cloud transition from becoming a multi-month fire drill.

What clients say

Trusted by founders and operations leaders

They correctly identified which of our systems needed a full rearchitect and which just needed rehosting. Saved us real budget.

CTO
SaaS platform company

Our on-premise-to-cloud migration happened with zero unplanned outages across twelve interconnected systems.

VP of Infrastructure
Financial services company

Security review caught gaps in our access controls that had existed for years on-premise.

IT Director
Healthcare technology company

They correctly identified which of our systems needed a full rearchitect and which just needed rehosting. Saved us real budget.

CTO
SaaS platform company

Our on-premise-to-cloud migration happened with zero unplanned outages across twelve interconnected systems.

VP of Infrastructure
Financial services company

Security review caught gaps in our access controls that had existed for years on-premise.

IT Director
Healthcare technology company

Frequently asked

Questions US founders ask about this service

By assessing each workload for rehosting versus rearchitecting, provisioning the cloud environment to match or exceed current capacity, migrating data and applications in a staged sequence, and validating performance before decommissioning on-premise infrastructure.

Network security group configuration matching or improving on-premise controls, encryption for data at rest and in transit, identity and access management review, and a security audit of the new environment before go-live.

Cost depends on the number of workloads, whether they’re rehosted as-is or rearchitected for cloud-native services, and data transfer volume, rather than a flat per-server rate.

Rehosting moves an application to the cloud with minimal changes, a lift-and-shift. Rearchitecting redesigns the application to use cloud-native services, which costs more upfront but typically reduces long-term operating costs and improves scalability.

Inventory every workload and dependency, classify each for rehosting or rearchitecting, sequence migrations to minimize cross-system risk, and define validation criteria and a rollback plan for each stage.